GALLERY: Week 23 progress (18 January 2016)

  • The sill course for the northern Nave is currently being installed along the entire length of the facade.
  • Lyon Constructions have returned to site following the Christmas and New Year period. The timber formwork at the western gable end of the Nave has been inspected by structural engineer and is now completed with the concrete pour having taken place. Australian Slate will return to site on the 01/02/16 to install the flashing and remainder of the slate roof.
  • The painters have returned to site to complete the painting of Ancillary Building 'A'. The results from the moisture test reading are now at an acceptable level.

Week 23 progress